Standby Generator Installation Services in Pinecrest, FL
A standby generator starts on its own when the power goes out and shuts down when utility power returns. You do not have to drag out a portable unit or run extension cords through the house.
A generator that starts itself
We size the unit to your home, set the pad, connect the transfer switch and fuel line, and test the system under load. We also handle the permit paperwork and the final inspection with the county, so the job is finished properly.
Most jobs run about 6 to 10 weeks from the first site visit to a tested system. The on-site work takes a day or two; the permits take the longest.
- Whole-home and essential-circuit options
- Automatic start and weekly self test
- Permit paperwork and inspection handled
- Full load test before handover
What Does a Standby Generator Cost?
Every home is different, so these are typical ranges for installed, permitted jobs in our area — not a quote. Your written price comes after a site visit and a load calculation, and it covers the unit, the transfer switch, the fuel connection, the pad, the permits and the inspection.
| Job | Typical installed range |
|---|---|
| Most standby generator installs | $11,000–$22,000 |
| Whole-home systems | Typically $19,000–$28,000 |
| Generac 22kW air-cooled, installed | About $11,000–$16,000 |
| Cummins 20kW, installed | About $9,000–$14,000 |
| Full range, small to large homes | $8,000–$40,000+ |
Ranges are based on published South Florida contractor pricing from 2026. Larger homes with two air conditioners, a pool pump and a long gas run sit at the top of the range; smaller essential-circuit systems sit at the bottom.
How Long Does It Take?
From the first site visit to a tested system, most jobs run about 6 to 10 weeks. The on-site work itself is quick — a day or two. The permits take the longest, and that part depends on the village and county schedule.
- Site visit and load calculation — 1 to 2 hours. We visit your home, measure the real load, check the panel and gas supply, and pick the spot for the unit.
- Written price and equipment order — 1 to 4 weeks. You get the price in writing. Once you approve, we order the unit.
- Permits — 2 to 6 weeks. Electrical and gas permits with the village and county. The Village of Pinecrest’s own instructions say permit processing can take up to 30 working days, so this is the step that sets the schedule.
- Concrete pad — day 1. A reinforced slab, set and anchored to code.
- Gas, electrical and transfer switch — day 1 to 2. The unit is set, the fuel line and transfer switch are connected, and the gas work is pressure tested.
- Inspection and startup. The inspector signs off, then we test the whole system under load with you there.
Permits in Pinecrest: What the Village Requires
A generator install in Pinecrest needs a village permit and a county electrical and gas inspection, and the Village of Pinecrest spells out exactly what it wants. We prepare the paperwork, submit it and meet the inspector on site, so you do not have to chase the process.
- Electrical and gas permits are both required.
- A signed and sealed survey showing the septic tank and drainfield.
- The pad must sit at least 5 feet from any property line.
- The exhaust must be at least 10 feet from operable doors, windows, vents and packaged air conditioning units.
- The generator can never sit forward of the front or corner-side building line.
- A minimum 4-inch reinforced concrete slab, anchored with 4 × 1/2-inch × 4-inch hot-dipped galvanized or stainless steel bolts.
- In an AE flood zone, the top of the pad must be at least 1 foot above the FEMA base flood elevation.
- Sound limit of 65 dBA, with higher levels allowed at greater setbacks.
- The unit must be screened from public view.
- Testing is limited to once a week, no more than 30 minutes, between 8 a.m. and 6 p.m., Monday through Saturday.
The memo also covers carbon monoxide detector placement, UL listing, DERM approval for diesel or gasoline fuel, and permanent signs at the service entrance and transfer switch. Source: Village of Pinecrest — Generator Permit Application Requirements (June 8, 2020, Leo Llanos, P.E., Building Official).
Standby Generators Pinecrest Is Proud to Serve Florida
Why Choose Us for Standby Generator Installation?
Whole-home or essential circuits
A standby generator can power the whole house, or just the circuits that matter most — air conditioning, the fridge, lights and medical equipment. We size it to what you want to keep running.
Starts itself, tests itself
The transfer switch starts the generator when the power goes out and shuts it down when utility power returns. A weekly exercise run keeps the unit ready.
Permits handled
Generator installs need electrical and gas permits and an inspection. We prepare the paperwork and schedule the inspection as part of the job.
Tested under load
Before we leave, the whole system is tested under load, so you know it works before the next storm, not during it.
Contact Us Today for a Free Estimate
Call 786-589-9026 or request a free estimate. No obligation.
Free — no obligations